As a growing business, Rheem needed to improve their manufacturing process.

CA’s experience and local support was used through the entire Project Life Cycle from Consultation, Design, Equipment Design, Build, Install to Commission.

CA successfully installed Hot Water Foaming Line featuring:

  • Infloor trolley tow system
  • 8 work stations with Track Stops
  • 3 Positive Positioners for product rotation and the robot cell

CA’s in house experienced Engineers and Technicians ensured the project ran smoothly and within the required timeframe.