Case Studies

Orica 2011

Case Study

As the leading Global brand in Mining services, Orica needed to work with a reliable partner to improve their process on their Cyanide Boxing Line.

CA was asked to manage the project from Consultation, Design, Equipment Design, Build, Install to Commission.

The project consisted of:

  • Box Staging Conveyors
  • Filling Booth with Vibratory Conveyor and Weight Station
  • Inspection Station
  • Automatic Box Lidding
  • Labelling and Strapping

CA’s experience and knowledge of the customer’s needs meant that the project exceeded expectations with deliverables and time frame achieved.

< Back